Bottle Conveyor For Beverage Production Line

High quality bottle conveyor for PET bottle beverage production line.

Category:

Description

This bottle conveyor for sending bottles with beverage  from filling machine to labeling machine to packing machine.load-bearing chain scraper conveyor frame adopts stainless steel 304 thickness 2.5mm, once laser bending forming, material surface 2B board, device height 180mm. Inside the machine frame, the transverse bracing is made of stainless steel, 304 thickness 3mm is bent and formed. The active bearings and the passive shafts are made of stainless steel 2Cr13 material, and the shaft diameter is 40mm.Plate conveyor, all bearings imported NSK brand, plastic shell, with safety cover, using 440 stainless steel bearings.Under the conveyor chain plate, the sink adopts stainless steel 304, thickness 1.2mm, sheet bending forming, contact side using bilateral bending, 180 degrees fillet, cleaning staff protection. The lower part of the tank is equipped with stainless steel 304, diameter 50.7mm, thickness 1.5mm seamless drainage pipe, the whole line is arranged, and the drainage pipe is fixed by a fast chuck, which can be quickly removed and cleaned.

  1. Chain protecting board: high strength engineering plastic
  2. with water tray, cable trunking and side guide design
  3. XL Motors and great wall gears
  4. Danfoss converter
  5. Mitsubishi PLC
  6. Pro-face touch screen

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, Filling machine(bottle conveyor) and Packaging machine etc.

 

 

 

 

 

Q: What is the warranty if we buy your machines?

A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

Q: How about the spare parts?

A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

Q: How to install my machines when it arrives? What is the cost?

A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

Q: How long time for installation?

A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

Q: When can I get my machine after I paid?

A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.

 