1. Before each shift, blowing part each unit must be lubricated once. (manipulator, manipulator guide, open and close mold guide)
2. The swing arm can be added once (3 – 4) days. Heating machine large chain, small chain can be once a month. Check the main engine reducer and heating machine reducer for lack of oil. The main bearing can be added once every two to three months.
3 . Before production, check if the bottle blowing machine moving parts are fixed and whether the screws loosen and fall off, especially if the impact force is strong, and whether the belt drive part is abnormal.
4 . Check whether high and low pressure gas source, power source and water source are normal.
5. Check each emergency stop switch, safety door switch, protective device detection switch is normal.
6 . Check the warming head into the embryo, if the embryos are working properly. Insert the embryo if not in place to adjust the embossing device nut.
7. Check the lamp for damage and break. Replace it in time.
8 . Check whether each pneumatic component leaks and the action is sensitive.
9. Whether the triplex is abnormally leaky, whether it is blocked, and whether the water in the cup is too full.
10. If there is an abnormality in the solenoid valve of the blowing machine, it must be cleaned in a timely manner.
11. When the high and low pressure gas source switch is turned on, it must be operated slowly to prevent the gas source from flowing too fast. The dirt can be blown into the solenoid valve and the exhaust valve can be opened for 30 seconds to ensure the air is clean.
12. When starting the machine, it must be convinced that the mechanical part is good and that no one inside the machine has any foreign objects. Especially shake the position to avoid hurting people. At the same time, close the security door.
13. When starting the machine, the motor must be started and the heating machine must be delayed for 30 seconds to prevent voltage fluctuations. Before starting warming, make sure that the cooling water is not turned on.
14. After warming start (2-3) minutes, wait until the oven temperature rises evenly and press the embryo button. At the same time, the bottle blowing power must also be turned on, otherwise it will not blow the bottle.
15. When the plastic bottle blowing machine is in operation, it must pay close attention to whether the machine has abnormal noise.
16. In the event of an emergency, the emergency stop button may be pressed for emergency braking. Then analyze the cause of the formation according to the site conditions and find a quick solution to the problem.
17. After normal operation of the machine, do not put any part of the body into the machine to avoid injury to the robot. If the machine has abnormal noise, it can be observed after deceleration.
18. After the machine is normally produced, the operator must observe the quality of the bottle from time to time in order to avoid fluctuations in the voltage or other factors affecting the blowing quality.
19. When the bottle blowing machine is repaired, press the touch screen fault repair button to ensure safe maintenance.
If you need to manually observe the action of each individual cavity, please pay attention to the position of the robot. At the same time, be sure to clear the role of individual buttons, and then move. Make sure that malfunctions cause unnecessary trouble.