Menu Close
çankaya escort ankara escort

2000BPH 8-8-3 Water Bottle Filling Machine

2000BPH water bottle filling machine for the investor who want to start the water factory and with low investment.

Description

Water Bottle Filling Machine Description

2000BPH water bottle filling machine for the investor who want to start the water factory and with low investment. This kind of machine is good tenacity, strong-intensity and hard-breakage.

Water Bottle Filling Machine Features

  1. This water bottle filling machine adopts advanced human-machine interface control. High quality international name brand key components.
  2. Suspension bottle neck catcher structure allows the machine change the bottle type easily. By changing the valves, it also can be used as hot filling machine.
  3. Spring type rinsing catcher can wash both inside and outside of the bottle.
  4. High accuracy pressure water filling mechanism, ensure the height and quantity of the water filling.
  5. Magnetic powered cap device ensures tightness and prevents damage of the caps.
  6. Quiet, rotary cap unscrambler will not damage caps. Photoelectric sensor detect missing caps thus eliminating uncapped bottle spillage.
  7. Built-in safeguard mechanism ensures the safety of operator and machine.
  8. High efficient air clean filter system ensures high sanitary requirement.
  9. Low overall machine noise.
  10. Self-lubricating system imported from America provides continuous smooth operation.

Water Bottle Filling Machine Technical Parameter

Model CGF 8-8-3
Washing workstation 8
Filling workstation 8
Capping workstation 3
Production capacity(500ml)(B/H) 2000
Suitbale bottle specification(mm) Φ=50-100, H=170, Volume=330-2250ml
Motor power(KW) 2.2
Overall dimension(mm) 2300×1700×2000
Weight(kg) 2500

Other models

Model Washig heads Filling heads Capping heads Production B/H
CGF14125 14 12 5 3000-4000
CGF18186 18 18 6 5000-7000
CGF24248 24 24 8 8000-12000
CGF323210 32 32 10 12000-15000
CGF404012 40 40 12 16000-20000
CGF505012 50 50 12 20000-24000
CGF606015 60 60 15 25000-30000
CGF808020 80 80 20 35000-40000

Detailed Photos of Water bottle filling machine

Water Bottle Filling Machine Water Bottle Filling Machine Water Bottle Filling Machine Water Bottle Filling Machine

Working video

About us

We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, water bottle filling machine and Packaging machine etc.

 

 

 

 

 

Q: What is the warranty if we buy your machines?

A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.

Q: How about the spare parts?

A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.

Q: How to install my machines when it arrives? What is the cost?

A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).

Q: How long time for installation?

A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.

Q: When can I get my machine after I paid?

A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.

Reviews

There are no reviews yet.

Be the first to review “2000BPH 8-8-3 Water Bottle Filling Machine”

Your email address will not be published. Required fields are marked *