Description
Product Description
5 gallon filling machine consists of washing, filling and capping, which is applied to the production of 3 or 5 gallon purified water and mineral water. The capacity can meet different production requirements from 100BPH to 1200BPH
This entire 5 gallon filling line includes the following optional equipment:cap pulling machine, leak detection machine, brushing machine, automatic barrel loading device, washing/filling/capping three-in-one machine, barrel neck thermal machine, bagging machine, palletizer etc.
Features
- 3-5 gallon filling machine producing capacity:100-1200BPH
- PLC control+ English MMI
- Bottle volume: 3 gallon-5 gallon
- Barrel packaing is different from small PET bottle packing, usually the barrel is recycling using, so the barrel cleaning is very important as the first step. In our rinsing machine, the barrel will be cleaned by multiple liquid, from alkali water to disinfect water, and then to the pure wate to ensure every barrel can be cleaned absolutely. And then the filling machine and capping machine will start to work automatically.
- In our capping machine, there is pure water spraying device to sterilize the cap. Avoid any pollution to the water.
Technical Parameter
Model | QGF-100 | QGF-300 | QGF-450 | QGF-600 | QGF-900 | QGF-1200 | ||
Filling heads | 1 | 2 | 3 | 4 | 6 | 12 | ||
Volume(gallon) | 3-5 gallon | |||||||
Barrel size(mm) | Φ270*490 | |||||||
Capacity(B/H) | 100 | 300 | 450 | 600 | 900 | 1200 | ||
Gas consumption(m³/min) | 0.37 | 0.6 | 0.8 | 1 | 1.5 | 1.8 | ||
Power(kw) | 1.4 | 4 | 4 | 7.5 | 10 | 16 | ||
Weight(kg) | 500 | 1500 | 2100 | 3000 | 4300 | 6000 |
Detailed Photos of Water filling machine
Working video
About us
We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, PET preform mould, plastic bottle blowing machine, Water treatment system, Filling machine and Packaging machine etc.
Q: What is the warranty if we buy your machines?
A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.
Q: How about the spare parts?
A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.
Q: How to install my machines when it arrives? What is the cost?
A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).
Q: How long time for installation?
A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.
Q: When can I get my machine after I paid?
A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.
Reviews
There are no reviews yet.